September 21, 2026
NVIDIA certifies more than chips: DSX Ready approves power and cooling for AI data centers
On 21.09.2026, NVIDIA introduced DSX Ready: power and cooling validation for compatibility with its AI data center architecture.

On 21.09.2026, NVIDIA introduced DSX Ready: power and cooling validation for compatibility with its AI data center architecture.
NVIDIA says chips are not the construction bottleneck; power, water, site capacity, and the grid are.
